Government Projects

PDF Project:  City Hall HVAC Evaluation and Design Improvement


IMAGE

Client:  
City of Wasilla

Location:  
Wasilla, Alaska

Project Scope:  
GNE provided mechanical design and construction engineering services for two HVAC upgrades at the City Hall building.

Calculations of required heating capacity and recommendations to correct deficiencies. Investigation of the existing ventilation system to determine the cause of failures in system operation. On-site troubleshooting in conjunction with a local HVAC contractor, recommendations to remedy the failures and any improvements to the ventilation system.

Project Details:


  • Provided calculations of heating requirements, equipment selection data, and
            installation drawings as required
  • Provided report of troubleshooting findings with appropriate recommendations
            for remedy
  • Provided project closeout documentation
  • Provided construction support and coordination with HVAC contractor for
            on-site construction work with regards to equipment selection, submittal reviews
            and methods.


Copyright © 2017 - Great Northern Engineering, all rights reserved.
No content to be reproduced without written permission.