Oil and Gas Projects

PDF Project:  South Terminal Hydrant Relocation Phase II


South-Terminal-Hydrant-Relocation-Phase-II-2.jpg Client:  
State of Alaska DOT/PF, DEC

Location:  
Ted Stevens Anchorage International Airport

Project Scope:  
Provided the design for the airside hydrant jet fuel piping system modifications to support the South Terminal Seismic and Security Retrofit project.

South-Terminal-Hydrant-Relocation-Phase-II-1.jpg All engineering services were provided in accordance with the requirements of the latest applicable local, State, and National regulations and codes..

Project Details:


  • Developed design drawings with pipeline routing, profiles, and details of the system, coordinated with the location of the concrete hard stand parking areas
  • Reviewed the fueling procedures for each type of aircraft used, to be sure the hydrant locations are situated in the most ideal location for fueling
  • Developed technical specifications in the standard FAA format that reflect the hydrant system construction scope of work
  • Issued a final Engineer’s Estimate for the work